ASTOR ENERJİ A.Ş.
• Between 2018 and 2020, we carried out the production of metal clad panels by performing mechanical assembly and cabling workmanship.
• Between 2019 and 2025, we carried out the production of 154 kV high voltage circuit breaker panels.
• Between 2024 and 2025, we performed cabling workmanship for mobile transformer substations.
• Between 2025 and 2026, we carried out the production of monoblock concrete kiosks.
• Between 2025 and 2026, we carried out RMU mechanical assembly works.
• Between 2025 and 2026, we performed after-sales technical service works.
/media/2026/04/9c78d05d-c916-4f06-ab4e-021ca4e9e741.png
References
References
ATS ELEKTRİK PANO A.Ş.
• In 2024, we carried out the production of sheet metal kiosks by performing mechanical assembly and cabling workmanship.
• In 2025, we carried out the production of sheet metal kiosks by performing mechanical assembly and cabling workmanship.
• In 2025, we carried out the production of low voltage (LV) panels by performing mechanical assembly and cabling workmanship.
/media/2026/04/95cb588d-766f-4cc7-94c9-5878302ad15c.png
LMZ ELEKTROMEKANİK SAN. VE TİC. LTD.ŞTİ
• In 2024, we carried out the mechanical assembly and cabling workmanship of mobile transformer substations on a turnkey basis.
/media/2026/04/bc96e1c2-30fd-474b-97f3-1774aac5b5a1.jpeg
KONTROLMATİK TEKNOLOJİ ENERJİ VE MÜHENDİSLİK A.Ş.
• In 2024, we carried out the production of AC, DC, metering, and KRP panels by performing mechanical assembly and cabling workmanship.
/media/2026/04/3b2a6f3a-d52e-419c-ac5b-65b1deac6425.jpeg
ARMTEK ELEKTRİK TAAHHÜT A.Ş.
• Between 2020 and 2024, we carried out the production of metal clad panels by performing mechanical assembly and cabling workmanship.
• Between 2023 and 2024, we carried out the production of concrete kiosks and sheet metal kiosks by performing mechanical assembly and cabling workmanship.
• Between 2023 and 2024, we carried out the production of modular cells by performing mechanical assembly and cabling workmanship.
• Between 2023 and 2024, after-sales technical service was provided throughout Türkiye and abroad.
• Between 2024 and 2025, we carried out the production of mobile substations and metal clad panels by performing mechanical assembly and cabling workmanship.
/media/2026/04/89600b14-d94b-41ef-b459-9dae5fc09395.jpg
VOLTBERG ENERJİ SAN. VE TİC. A.Ş.
• Between 2024 and 2025, we carried out the production of concrete kiosks on a turnkey basis.
• In 2025, we provided after-sales technical service.
/media/2026/04/f44ec920-a8da-43b7-a547-c3eb5f32fe67.png
ELEKTROLOJİK ENERJİ TEKNOLOJİLERİ LTD. ŞTİ.
• Between 2024 and 2025, we carried out the production of modular cells by performing mechanical assembly and cabling workmanship.
• Between 2024 and 2025, we carried out the production of low voltage (LV) panels by performing mechanical assembly and cabling workmanship.
• Between 2024 and 2025, we carried out the production of metering panels by performing mechanical assembly and cabling workmanship.
/media/2026/04/dc8293c4-df7a-4804-8168-e93b966f1cc0.jpg
GAMA GÜÇ SİSTEMLERİ MÜHENDİSLİK VE TAAHHÜT A.Ş.
• Between 2024 and 2025, we carried out RTU panel installation and connections, SCADA cable laying, and commissioning works at domestic sites.
• In 2025, we carried out sheet metal kiosk installation and mechanical assembly works at domestic sites.
/media/2026/04/0337ebff-10bd-4b86-8b21-2d56501e1256.jpeg
EKOS TEKNOLOJİ VE ELEKTRİK A.Ş.
• In 2025, we carried out cabling workmanship for TEİAŞ mobile transformer substations.
• Between 2025 and 2026, we carried out the production of metal clad panels by performing mechanical assembly and cabling workmanship.
• Between 2025 and 2026, we carried out the production of air-insulated cells by performing mechanical assembly and cabling workmanship.
• Between 2025 and 2026, we carried out the production of primary GIS systems.
/media/2026/04/77c38569-d20b-415a-8f9f-1f50f219fbd0.jpeg
SFA ELEKTROMEKANİK ELEKTRİK SAN. VE TİC. A.Ş.
• Between 2025 and 2026, we provided after-sales technical service.
/media/2026/04/5c8b88b0-ce63-4c62-99fb-3fd31ad49fca.jpeg
HAWK POWER ENERJİ A.Ş.
• Between 2025 and 2026, we carried out the production of metal clad panels by performing mechanical assembly and cabling workmanship.
/media/2026/04/3587818c-9ce9-458f-a09a-f696f960f0de.jpeg
CW ENERJİ MÜHENDİSLİK TİC. VE SAN. A.Ş.
• Between 2019 and 2026, we provided after-sales technical service.
• In 2026, we carried out the production of modular cells.
/media/2026/04/fac8cdb3-2941-4cf7-817d-7a42d1608162.jpeg
KVK ELEKTRİK ENERJİ A.Ş.
• Between 2019 and 2026, we provided after-sales technical service.
/media/2026/04/0c23f7d0-ffc8-47c2-902b-f6bba8c1f584.jpeg
ULUSOY ELEKTRİK A.Ş.
• Between 2013 and 2022, we carried out the production of metal clad panels by performing mechanical assembly and cabling workmanship.
• Between 2013 and 2022, we carried out the production of RMU units.
• Between 2013 and 2022, we provided after-sales technical service.
/media/2026/04/794d53e2-d9e2-46fe-93ff-16f853d4ec43.jpeg
AKTİF ELEKTROTEKNİK A.Ş.
• Between 2019 and 2020, we carried out the production of metal clad panels by performing cabling workmanship.